• Home
  • About Well Home
    • Company Introduction
    • Company showroom
  • Architectural Design
    • Design Application Procedure
    • Design case
      • Architectural Drawing
      • Interior Design
  • New Construction & ADU
    • Construction Procedure
    • Construction & Renovation project case
  • Luxury Residential Design
    • Architectural appearance
    • Whole house customization
      • Kitchen Cabinets
      • Bathroom
      • Living Room and Bedroom
      • Walk-in Closet
    • Landscaping
  • Expert interviews
  • Contact us
  • Home
  • About Well Home
    • Company Introduction
    • Company showroom
  • Architectural Design
    • Design Application Procedure
    • Design case
      • Architectural Drawing
      • Interior Design
  • New Construction & ADU
    • Construction Procedure
    • Construction & Renovation project case
  • Luxury Residential Design
    • Architectural appearance
    • Whole house customization
      • Kitchen Cabinets
      • Bathroom
      • Living Room and Bedroom
      • Walk-in Closet
    • Landscaping
  • Expert interviews
  • Contact us

中文

  • ►
    Step 1: Groundbreaking ceremony --- Technical Staff Standby — Staking out — Leveling & Trenching
  • ►
    —Rebar Installation — Vapor Barrier Installation ​— First Inspection Check-off
  • ►
    Step 2: Material Check — Underground Plumbing Installation (Supply Water Line, Sewer Line, Gas Line) — Second Inspection Check-off
  • ►
    Step 3: Pouring Concrete - Third Inspection Check-off (First Phase Completion)
  • ►
    Step 4: Wood Framing (Floor, Wall, & Roof) --- Penetration Over Wood Framing (Water & Electric Line) — Forth Inspection Check-off (Rough Framing & Rough Plumbing) — Enclosing Exterior Wall/Roof (Wood Sheathing) — Enclosing Exterior Wall (Waterproof & Stucco) — Electric Panel Installation — HVAC Installation -- Insulation Installation — Fifth Inspection Check-off --- Enclosing Interior Walls & Ceilings (Gypsum Board) --- Roofing (Waterproof P叩er & Roofing Material) --- Sixth Inspection Check-off
  • ►
    Step 5: Exterior Doors & Windows Installation --- Seventh Inspection Check-off - Interior Construction - Apply compound & Taping, Shower bathroom Waterproofing --- 24-48 Hours Waterproofing Test
  • ►
    Step 6: Install Water Heater, Lighting Fixtures (Fixed), Cabinets, Plumbing Fixtures, Flooring Material, Staircase Hand & Guardrail ---Seventh Inspection Check-Off
  • ►
    Step 7: Install Kitchen Appliances, Lighting Fixtures (Flexible), Media & Audio System, Air Conditioning System, along with Company Supervision Engineer to check-off quality of the whole house with the Owner - Eighth Inspection Check-Off
  • ►
    Step 8: Construction Finalization (Signature on Construction Acceptance Form, Owner receiving Home Warranty, Key, Manual, and Remote Controls) - Completion of Construction